Haddadinco Awarded Construction of Construction of Facilities for Amman Bus Rapid Transit System (Package 3) - 46 Jun 2016 Print E-mail

Haddadin Engineering Company for Contracting was awarded the contract for Construction of Facilities for Amman Bus Rapid Transit System (Package 3) RFP No.(46/1/2016). The contract was signed by the Client Greater Amman Municipality.

The project consisted of construction of a BRT designated rout and a first quality concrete Bridge for general public use . A BRT route with length of 683m long running from Swaileh roundabout connected to the BRT lane previously constructed in package 1 .

The route comprises two lanes constructed predominately of flexible pavement with rigid pavements at stations. Also a grade A fairface concrete bridge with a total length of 257m post tensioned deck slabs on supported on 180x120cm 8piers and two abutment wall at both ends ,linked to existing surface roads with approach slabs and  rams confined between retaining walls at both ends of the bridge totaling 337m in  length. including infrastructure works  and modifying existing utilities and roads.

"We are working very hard and smart to achieve our goal"