Sahab Bridge
Work Type
- Underpass Construction
- The project consisted of two direction underpasses with 3 lanes for each Side.
- Retaining Walls, Electrical works, pavements & Guard rai ls.
- The project included the excavation works, Reinforcements according to design drawings. Load bearings pads, expansion Joints covers, water proofing and hand Rails protection.
- 4,000 m3 Concrete
- 350 tons of Steel Reinforcement
- Tunnel Built up a rea 360 m2
- Tunnel Long: 100 LM including Wing Walls
- Fast Track Project (5 months)
- Detouring works
- Post tensioning slab
Locations:
Amman, Jordan
Clients:
Greater Amman Municipality
Start Date:
01-10-2008
Finish Date:
01-02-2009