Al-Quasmeh Bridge
Work Type
  • Underpass Construction
  • The project consisted of two direction underpasses with 3 lanes for each side
  • Retaining Walls, Electrical works, pavements & Guard rails.
  • The project included the excavation works, Reinforcements according to design drawings.  expansion Joints covers, water proofing and hand Rails protection.
  • Post-tension Slab
  • 7,000 m3 Concrete
  • 550 tons of Steel Reinforcement
  • Tunnel Built up area 700 m2
  • Tunnel   Long: 80 LM
Locations:
Amman, Jordan
Clients:
Greater Amman Municipality
Start Date:
16-11-2005
Finish Date:
20-03-2006