Yajooz Intersection
Work Type
- Underpass Construction
- The project consisted of two direction underpasses with 3 lanes for each side
- Retaining Walls, Electrical works, pavements & Guard rails.
- The project included the excavation works, Reinforcements according to design drawings, expansion Joints covers, water proofing and hand Rails protection.
- Post-tension Slab
- 6,000 m3 Concrete
- 800 tons of Steel Reinforcement
- Tunnel Built up area 550 m2
- Tunnel Long: 420 LM with Wing Wall
Locations:
Amman, Jordan
Clients:
Greater Amman Municipality
Start Date:
02-09-2004
Finish Date:
07-03-2005