Skip to main content
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA
Image
QAIA

Queen Alia International Airport Departure Bridge

Location
Amman, Jordan
Client
J & P
time line
15/3/2009 - 30/06/2010
scope of work
The project is a 760 m long bridge with a total built up area of 19’230 m2, one-way traffic lane.

Avoided slabs were used with a variable heights starting from 3m up to 11 m , The work consists of “class A” fair face concrete. Precast elements used for parapets and retaining walls .

The project included the excavation works, Reinforcements according to design drawings. Load bearings pads , expansion Joints covers ,water proofing and hand Rails protection.