1/8/2007	1/12/2007

Al Shaheed & Al Aqsa Intersection

Location
Amman, Jordan
Client
Greater Amman Municipality
time line
1/8/2007 - 1/12/2007
scope of work
• Underpass Construction
• The project consisted of two direction underpass with 3 lanes for each
Side.
• Retaining Walls, Electrical works, pavements & Guard rails.
• The project included the excavation works, Reinforcements according to
design drawings, expansion Joints covers, water proofing and hand Rails protection.
• 8,000 m3 Concrete
• 600 tons of Steel Reinforcement
• Tunnel Built up a rea 360 m2
• Tunnel Long: 40 LM including Wing Walls
• Fast Track Project (4 months)
• Detouring works