Al Hashmiyah University Entrance Intersection
Location
Zarqa, Jordan
Client
Ministry of Public Works & Housing
time line
01/12/2006 - 01/12/2007
scope of work
• Underpass Construction
• The project consisted of two direction underpass with 3 lanes for each side
• Retaining Walls, Electrical works, pavements & Guard rails.
• The project included the excavation works, Reinforcements according to design drawings. expansion Joints covers ,water proofing and hand Rails protection.
• Post-tension Slab
• 7,000 m3 Concrete
• 550 tons of Steel Reinforcement
• Tunnel Built up area 700 m2
• Tunnel Long: 80 LM
• The project consisted of two direction underpass with 3 lanes for each side
• Retaining Walls, Electrical works, pavements & Guard rails.
• The project included the excavation works, Reinforcements according to design drawings. expansion Joints covers ,water proofing and hand Rails protection.
• Post-tension Slab
• 7,000 m3 Concrete
• 550 tons of Steel Reinforcement
• Tunnel Built up area 700 m2
• Tunnel Long: 80 LM